RECHERCHE PAR CATEGORIES
RECHERCHE PAR INSPIRATIONS
  • RECHERCHE PAR MARQUES DE MOTO

    Triumph Bobber radial brake kit

    31188

    • 🏍️ High performance braking : Allows to install a 4 -piston caliper for optimal braking power.
    • 🔧 Perfect compatibility : Designed for a front caliper with 40mm center distance (Brembo and major brands).
    • 💪 Premium quality : Black anodized aluminum, CNC cut for maximum solidity and sustainability.
    • ⚙️ Optimized installation : Clearly improves reactivity and braking safety on your Honda 500CL.

    4-INSTALLMENT PAYMENT

    TESTE ET APPROUVÉ

    TESTED ET APPROVED

    SATISFACTION 100%

    SATISFACTION GUARANTEED

    Front 4 piston front bracket for Honda CL500 - Aluminum CNC Anodized Black

    Improve him Braking your Honda CL500 with that front caliber support Designed for the installation of a caliper 4 pistons with a 40 mm center. Compatible with Brembo and other major brands, this adapter optimizes the power and reactivity of the braking.

    Features :

    • Compatibility : Honda CL500
    • Material : Aluminum CNC cut for maximum precision and robustness
    • Finishing : Black anodized For a sober and corrosion -resistant look
    • Design :
      • Allows the installation of a caliper 4 pistons with Lessler 40 mm
      • Improves the braking power and pressure distribution
    • Facility :
      • Direct replacement original caliper support
      • Compatible with original or larger diameter brake discs

    Benefits :

    Improved braking : Better power and modulation
    Precision and durability : High quality CNC aluminum
    Compatible with Brembo and other major brands
    Quick installation : Perfect adjustment on the original fork

    Applications:

    • Ideal for bikers looking Increased braking power
    • Perfect for preparations Coffee racer, scrambler or performance

    🚀 Boost the safety and efficiency of your Honda CL500 with this bracket before 4 pistons!

    Note

    72 -hour delivery = In stock
    Description availability = 7-11 days
    ```